Izmir University of Economy - Masterplan

Izmir, Turkey
Visualizzazione © Plasma Studio
Visualizzazione © Plasma Studio
Immagine © Plasma Studio
Visualizzazione © Plasma Studio
Visualizzazione © Plasma Studio
Visualizzazione © Plasma Studio
Visualizzazione © Plasma Studio
Immagine © Plasma Studio
Immagine © Plasma Studio
Visualizzazione © Plasma Studio
Foto © Plasma Studio
Disegno © Plasma Studio
Disegno © Plasma Studio
Architetti
Plasma Studio
Sede
Izmir, Turkey
Anno
2016-ongoing
Cliente
Izmir University of Economy
Design Team
Vittoria Bellassai, Andrea Cadioli, Eva Castro, Che Hung Chien, Micol Fronza, Giovanni Carlo Gentili, Mukal Gupta, Ulla Hell, Zengwei Jin, Holger Kehne, Haitao Ma, Valentina Mancini, Giulia Mariotti, Irene Mutschlechner, Edoardo Nieri, Peter Pichler, Wenx
Collaborators
Buro Happold London , PMA (PolyMorph Architects)

Given the steep topography of the terrain and the intention to stitch together the new buildings with the landscape, the task was to develop the massing as an artificial, jagged replication of the original hillscapes.

The essence of the landscape as “original” material is transformed and sculpted, (be)coming another self and forming an identity that is at once indexing the local geographic morphologies and specific latitude and environment and a projection of the logic of human rational thinking and spatial ordering.

The educational bands of the K12 and of the University are organized along a Back Bone and on Podiums, which links diverse functions and produces new connections through social interactions. The social interaction is fostered by inserting semi public/ leisure activities within the academic environment, so as to create a common strata, where the knowledge is distributed through informal encounters among students.

Being the total site area is 200138.6 sqm, Plasma Studio was commissioned the design of a school complex (K12: Kindergarten + Primary + Secondary + High School) and of the University, with four Clusters of Faculties, Residential buildings, Services and Sport Areas. The project, that will be developed in three phases, will be completed in 2037 with the construction of 140.500 m2.

Progetti collegati

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Rivista

Altri progetti di Plasma Studio

Zhuhai Public Cultural Center Library
Zuhai, China
Izmir University Of Economy
Izmir, Turkey
Mercedes-Benz Campus
Stuttgart, Germania
Schäfer Roofscape
San Candido/Innichen, Italia
Datong Twin Towers
Datong, China