Fire Station in Straubenhardt

Straubenhardt, Germany
Photo © Brigida González for wulf architekten
Photo © Brigida González for wulf architekten
Photo © Brigida González for wulf architekten
Photo © Brigida González for wulf architekten
Photo © Brigida González for wulf architekten
Photo © Brigida González for wulf architekten
Photo © Brigida González for wulf architekten
Photo © Brigida González for wulf architekten
Photo © Brigida González for wulf architekten
Site plan
Drawing © wulf architekten
Short section
Drawing © wulf architekten
Isometric view
Drawing © wulf architekten
Architects
wulf architekten
Location
Langenalber Straße 67, 75334 Straubenhardt, Germany
Year
2022
Client
Gemeinde Straubenhardt
Team
Julian Baun (PL), Milena Erdle, Alexander Jerosch-Herold, Daniela Scholz
Projektsteuerung
FRANKE BAUR Ingenieurgesellschaft mbH, Baden-Baden
Project management
FRANKE BAUR Ingenieurgesellschaft mbH, Baden-Baden
Construction management
2plus Baumanagement GmbH, Stuttgart
Structural engineering
f2k ingenieure gmbh, Stuttgart
Landscape design
Ramthun Landschaftsarchitektur, Baden-Baden
Building physics
Hüttinger Bauphysik, Lehrensteinsfeld
Awards
Fritz-Bender-Baupreis 2022, DAM Preis 2023 (Longlist), Hugo-Häring-Auszeichnung 2023 BDA Nordschwarzwald

The new fire station brings together six previously independent firefighting units at one strategically located site on Langenalberstraße. The project was designed with the goal of implementing circular construction and sustainable planning in accordance with the “Cradle to Cradle” principle.

The separation and stacking of the individual functional levels and the use of the site’s sloping terrain are part of the fundamental design concept. As a result, the sealed soil surface could be minimized and, moreover, the building structure nestles harmoniously into the topography. The massive concrete plinth is cut into the slope and the north-facing facade opens to the street. Inside are the garage for the firefighting vehicles and all the facilities required for operations, as well as storage and technical areas. The open-air intermediate level has two atriums and captures the surrounding landscape. It is reached along an external ramp and serves as a parking deck as well as an area for events. Raised up above this is a wooden structure that is wrapped in a homogeneous facade of white expanded metal. It accommodates a classroom, office areas, and other shared spaces. The stacking of the different functional zones is clearly recognizable from the outside, creating a distinctive appearance that establishes a strong identity.

By using recyclable materials that are low in harmful substances and can be easily separated and reused when dismantled, the building is a valuable raw material supplier and future material resource. The new fire station, one of the first Cradle to Cradle buildings in all of Germany, is a trailblazing building whose exemplary character acts as an important stimulus for future developments.

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by wulf architekten

Benzberg Educational Center in Markgröningen
Markgröningen, Germany
Research and Teaching Building of the University of Mannheim
Mannheim, Germany
Car Park P14 with SAB Bus Terminal
Stuttgart, Germany
Stuttgart Region Chamber of Industry and Commerce
Stuttgart, Germany
Exhibition Centre
Chongqing, China