Office Building Oskar
Munich, Duitsland
- Architecten
- Arnold / Werner
- Locatie
- Oskar-von-Miller-Ring 20, 80333 Munich, Duitsland
- Jaar
- 2018
- Klant
- Hines
- Team
- Arnold / Werner Architekten
- Signaletics and Light Installation
- Fantomas
In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.
Gerelateerde projecten
Magazine
-
From the Familiar to the Obscure
Vandaag
-
Alexandros Tombazis, 1939–2024
Vandaag
-
Green Over Gray
2 days ago
-
Life of Pei
3 days ago
-
OMA Does Dior
4 days ago